Mortar Calculator for Bricklaying

Get the brick count from the brick calculator in this section first, then use it here for the mortar that beds them. How much each brick takes depends on wall thickness and joint width, so it is an input: about 0.3 L per brick for a half-brick skin with 10 mm joints, 0.5–0.6 L for a solid wall. 500 bricks × 0.3 L is 150 L, and 15% for droppings brings it to 172.5 L — at 13 L a bag that is 13.3, so 14 bags.

Your numbers

Bags needed

14bags

Mortar volume

172.5L

Volume

0.1725

Formula

Mortar volume = Bricks needed × Mortar per brick × (1 + Waste allowance ÷ 100), Bags needed = ⌈Mortar volume ÷ Yield per bag (L)⌉

Mortar falls off the trowel and goes off on the spot board, so a 5% allowance is not enough; 15% is closer to site reality. Mixed mortar has to be used within about two hours, so do not gauge more than you can lay.

What to enter

InputDefaultAccepted range
Bricks neededBricks needed with mortar joints and waste counted.5000 and up
Mortar per brick (L)Mortar to bed one brick: about 0.3 L for a half-brick skin with 10 mm joints, 0.5–0.6 L for a solid wall.0.30 and up
Yield per bag (L)The volume one bag makes once mixed — copy the yield printed on the bag.130 and up
Waste allowance (%)The extra bought to cover breakage and offcuts.150 ~ 50

Step by step

FormulaMortar volume = Bricks needed × Mortar per brick × (1 + Waste allowance ÷ 100), Bags needed = ⌈Mortar volume ÷ Yield per bag (L)⌉
With the default numbersMortar volume = 500 × 0.3 × (1 + 15 ÷ 100), Bags needed = ⌈Mortar volume ÷ 13⌉
AnswerBags needed = 14 bags

Quick reference table

Results when only Bricks needed changes and everything else stays put.

Bricks neededBags needed (bags)Mortar volume (L)Volume (m³)
250786.30.0862
37510129.40.1294
50014172.50.1725
75020258.80.2588
1,000273450.345

What each result means

ResultAt default values
Bags needed (bags)How many bags to buy; they are not sold in fractions, so this rounds up.14
Mortar volume (L)The volume of mortar to gauge, waste included.172.5
Volume (m³)The space a solid holds — length cubed.0.1725

Common mistakes

Mortar falls off the trowel and goes off on the spot board, so a 5% allowance is not enough; 15% is closer to site reality. Mixed mortar has to be used within about two hours, so do not gauge more than you can lay.

Glossary

Bricks needed
Bricks needed with mortar joints and waste counted.
Mortar per brick
Mortar to bed one brick: about 0.3 L for a half-brick skin with 10 mm joints, 0.5–0.6 L for a solid wall.
Yield per bag (L)
The volume one bag makes once mixed — copy the yield printed on the bag.
Waste allowance
The extra bought to cover breakage and offcuts.
Bags needed
How many bags to buy; they are not sold in fractions, so this rounds up.
Mortar volume
The volume of mortar to gauge, waste included.
Volume
The space a solid holds — length cubed.

Frequently asked questions

Q. How is Mortar Calculator for Bricklaying calculated?

Mortar volume = Bricks needed × Mortar per brick × (1 + Waste allowance ÷ 100), Bags needed = ⌈Mortar volume ÷ Yield per bag (L)⌉ — Get the brick count from the brick calculator in this section first, then use it here for the mortar that beds them. How much each brick takes depends on wall thickness and joint width, so it is an input: about 0.3 L per brick for a half-brick skin with 10 mm joints, 0.5–0.6 L for a solid wall. 500 bricks × 0.3 L is 150 L, and 15% for droppings brings it to 172.5 L — at 13 L a bag that is 13.3, so 14 bags.

Q. Can you walk through an example?

With Bricks needed 500, Mortar per brick 0.3L, Yield per bag (L) 13, Waste allowance 15%, the answer is Bags needed 14bags.

Q. What do I need to enter?

Enter Bricks needed, Mortar per brick, Yield per bag (L), Waste allowance. The result recalculates as you type, and an empty box counts as zero.

Q. How much does the answer move if I change a number?

Changing only Bricks needed moves the answer to Bricks needed 250 → Bags needed (bags) 7 and Bricks needed 1,000 → Bags needed (bags) 27. The table below lays out five steps.

Q. How are the numbers rounded?

Money is shown to the nearest whole unit, percentages to one decimal place and everything else to two. What you see is rounded; the calculation itself carries the unrounded value forward.

Q. Anything to watch out for?

Mortar falls off the trowel and goes off on the spot board, so a 5% allowance is not enough; 15% is closer to site reality. Mixed mortar has to be used within about two hours, so do not gauge more than you can lay.