Home·Crafts

Yarn Weight to Length Calculator

The length and weight on the label fix the metres per gram. Put the remainder on a scale and you know what is left, which tells you how many more rows it will carry once you know the length a row eats.

Your numbers

Yarn length needed

1,280m

Metres per gram

4m

Formula

Yarn length needed = Yarn needed × Metres per ball ÷ Grams per ball

Subtract the core or band if the ball is still wound on one. Being 5 g out moves the answer by about 20 m.

What to enter

InputDefaultAccepted range
Metres per ball (m)Metres in one ball or skein, as stated on the band.2001 and up
Grams per ball (g)Grams in one ball — usually 50 or 100.501 and up
Yarn needed (g)The yarn weight in grams, not a number of balls.3200 and up

Step by step

FormulaYarn length needed = Yarn needed × Metres per ball ÷ Grams per ball
With the default numbersYarn length needed = 320 × 200 ÷ 50
AnswerYarn length needed = 1,280 m

Quick reference table

Results when only Metres per ball (m) changes and everything else stays put.

Metres per ball (m)Yarn length needed (m)Metres per gram (m)
1006402
1509603
2001,2804
3001,9206
4002,5608

What each result means

ResultAt default values
Yarn length needed (m)The yarn length in metres, matching the label.1,280
Metres per gram (m)Metres per gram — how you read length off leftover weight.4

Common mistakes

Subtract the core or band if the ball is still wound on one. Being 5 g out moves the answer by about 20 m.

Glossary

Metres per ball
Metres in one ball or skein, as stated on the band.
Grams per ball
Grams in one ball — usually 50 or 100.
Yarn needed
The yarn weight in grams, not a number of balls.
Yarn length needed
The yarn length in metres, matching the label.
Metres per gram
Metres per gram — how you read length off leftover weight.

Frequently asked questions

Q. How is Yarn Weight to Length Calculator calculated?

Yarn length needed = Yarn needed × Metres per ball ÷ Grams per ball — The length and weight on the label fix the metres per gram. Put the remainder on a scale and you know what is left, which tells you how many more rows it will carry once you know the length a row eats.

Q. Can you walk through an example?

With Metres per ball 200m, Grams per ball 50g, Yarn needed 320g, the answer is Yarn length needed 1,280m.

Q. What do I need to enter?

Enter Metres per ball, Grams per ball, Yarn needed. The result recalculates as you type, and an empty box counts as zero.

Q. How much does the answer move if I change a number?

Changing only Metres per ball (m) moves the answer to Metres per ball (m) 100 → Yarn length needed (m) 640 and Metres per ball (m) 400 → Yarn length needed (m) 2,560. The table below lays out five steps.

Q. How are the numbers rounded?

Money is shown to the nearest whole unit, percentages to one decimal place and everything else to two. What you see is rounded; the calculation itself carries the unrounded value forward.

Q. Anything to watch out for?

Subtract the core or band if the ball is still wound on one. Being 5 g out moves the answer by about 20 m.

Related calculators

Materials differ in density and absorption. If your label states a figure, use it — the defaults here are only common values.